Beat the Heat
- AI models are consuming more energy than before, creating heat that traditional data centers struggle to handle.
- Meanwhile, batteries are under pressure: Conventional backup systems lose power quicker, wear out sooner, and can’t always be trusted to keep critical systems running during outages.
- 500-backed XING Mobility delivers a power upgrade with BBx48. This industry-first system offers 5x more power than older tech, lasts up to 10 years, and fits easily into current setups with plug-and-play modules.
- A single chiller can cool 40 BBx48 units with just 10% of the energy older systems need, reducing energy waste and improving efficiency.
- The BBx48 System is available for next-generation data centers and edge environments, offering performance, reliability, and sustainability in an increasingly power-hungry world.
- Read the full story here.